Coyote Creek is set up with three "pods" around a central core. (See floor plan). At any one time, one track will be "off-track" for three weeks while the other three tracks are in the pods. After three weeks, the track that was off "tracks "back in to a room being vacated by the off-going track.
The pods are set up as vertical teams. Each pod had grades 1-6, with kindergartens being located in the center of the building. Therefore, when a new track comes back, although the pod is new, the children still go to a familiar classroom layout (the same room location as in the other pods)
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Track in to Blue Pod | ||
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Track in to Red Pod | ||
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Track in to Yellow Pod | ||
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
| An easier way to think of it is :A Follows B, B follows C, C follows D, D follows A..." when tracking on. Good luck! | |||
|
|
|
||
|
|
|||